Skip to main content

Table 5 Results for 33 bus system with DG at upf

From: Optimal DG placement for benefit maximization in distribution networks by using Dragonfly algorithm

 

Without DG

Voltage sensitivity index method (Murthy and Kumar 2013)

Proposed method

DG location

–

16

6

DG size (kW)

–

1000

2590.2

Total real power loss (TLP) (kW)

211

136.7533

111.0338

Total reactive power (TLR)loss (kVAR)

143

92.6599

81.6859

Vmin (p.u.)

0.904

0.9318

0.9424

Cost of energy losses ($)

16,982.5724

11,007.9901

8930.65

Cost of PDG ($/MW h)

 

20.25

52.05