Skip to main content

Table 5 Coefficient for cost correlations of civil works (Singal et al., 2008)

From: Design models for small run-of-river hydropower plants: a review

S. no.

Type of turbine

Type of generator

Coefficient for cost correlations

Power house (\({C}_{3}\))

\({a}_{3}\)

\({x}_{3}\)

\({y}_{3}\)

1

Tubular Semi-Kaplan

Synchronous

105,555

− 0.2380

− 0.0602

2

Tubular Semi-Kaplan

Induction

105,555

− 0.2380

− 0.0602

3

Vertical Semi-Kaplan

Synchronous

94,594

− 0.2377

− 0.0622

4

Vertical Semi-Kaplan

Induction

94,594

− 0.2377

− 0.0622

5

Bulb Semi-Kaplan

Synchronous

85,805

− 0.2371

− 0.0599

6

Bulb Semi-Kaplan

Induction

85,805

− 0.2371

− 0.0599

7

Tubular Propeller

Synchronous

103,890

− 0.2386

− 0.0604

8

Tubular Propeller

Induction

103,890

− 0.2386

− 0.0604

9

Vertical Propeller

Synchronous

93,133

− 0.2382

− 0.0624

10

Vertical Propeller

Induction

93,133

− 0.2382

− 0.0624

11

Bulb Propeller

Synchronous

82,122

− 0.2384

− 0.0604

12

Bulb Propeller

Induction

82,122

− 0.2384

− 0.0604

13

Tubular Kaplan

Synchronous

111,756

− 0.2389

− 0.0605

14

Tubular Kaplan

Induction

111,756

− 0.2389

− 0.0605

15

Vertical Kaplan

Synchronous

100,998

− 0.2387

− 0.0607

16

Vertical Kaplan

Induction

100,998

− 0.2387

− 0.0607

17

Bulb Kaplan

Synchronous

91,039

− 0.2383

− 0.0603

18

Bulb Kaplan

Induction

91,039

− 0.2383

− 0.0603